Signature Projects: Our Clients trust us with their most important projects. Valuing time, water, & financial investment is core for our firm. Whether it is your private residence, hospital, or non-profit headquarters, Hines provides a safe pair of hands to shepherd your project along.

Here is a small selection of our signature project work.


Lincoln Commons

Site

Chicago, IL

client

Hines-McCaffery

size

8 Acres

━━━━━━

Hines has been honored to provide irrigation design for the Lincoln Common luxury apartments. This design features planting areas throughout a mixture of refurbished and new buildings, consisting of plazas, streetscapes, and numerous amenity decks. Other than a few small patches of grass at street-level, plantings throughout plaza and terraces/amenity decks have created a welcomed green space among dense urban development, just a few blocks west of Lincoln Park.

 

What we accomplished:

 

1.

Efficient irrigation (mix of drip & micro-sprays) captured small planting pockets across entire development.

 

2.

Multiple controllers brought together on a central platform with remote access for each.

 

3.

Extensive coordination with MEP team to ensure water connections and backflows for all green spaces on numerous different levels of the buildings.

 

Interlocken

Site

Broomfield, CO

client

Interlocken Association

size

1,000 Acres

━━━━━━

For over 25 years, Hines Engineers have provided planning, engineering, design, irrigation water analysis, & water management services for this 1,000-acre advanced technology campus. Sporting a 10,000 GPM pumping station, over 400 feet of site elevation change, & a 36-hole golf course, Hines Engineers have been integral in the design of each element of this extensive non-potable irrigation system serving common area landscape and tenant properties.


 

What we accomplished:

 

1. 

Provided a 3% accuracy rate in estimating site water use over the past 25 years!

 

2.

In addition to design, Hines Engineers have assisted in infrastructure review, replacement, reserve study development, & asset value determination.

 

3.

Control system management, commissioning, & programming assistance by Hines Engineers has provided years of efficient water management.

 

Port Lands

Site

Toronto, Canada

CLIENT

Waterfront Toronto

SIZE

593 Acres

━━━━━━

Primarily a flood protection project, our mission was to enhance plantings along the Don River (during establishment) and the more heavily programmed park grounds at higher elevations.

 
 

What we accomplished:

 

1.

Water savings of over 25% was achieved versus traditional means, without being a LEED project.

 

2.

Pulling water from Lake Ontario, we devised a system to temporarily irrigate 46 acres of riverbank to get native plantings established- with an anticipated need of two years.

 

3.

Provided irrigation on high- use turf areas and efficient nozzles for planted areas throughout,. Established a cloud-based controller system with weather-programming that allows monitoring and management of of the system remotely.